SUCO, Ras Budran Offshore Production Platforms |
Single Bouy Mooring, 2 Sub Sea Pipelines, 5 offshore Fixed Platforms, Flare Tripod Offshore Platform, Production 4-Leg Offshore Platform |
- Third Part Inspection On Behalf Of Timsah Company
- Preparation Of N.D.T Procedures
- Performance of all N.D.T. Required Including UT, RT, MPT, LPT
|
1981 - 1984 |
Abu Qir Power Station |
4*150 Mega Power Station Units, Tanks, Piping and Pipelines |
- Supervision of Tanks Construction
- Welding Inspection
- Film Interpretation
- Performance of Ultrasonic Testing on High Pressure Piping Joints
|
1981-1984 |
Wepco Abu Qir Phase II |
One Offshore Production Platform P2,One Offshore Accommodation Platform Q
L.P.G Treatment Unit Onshore |
- Preparation Of Required N.D.T Procedures
- Performance Of All UT, RT, MPT, LPT
- Onshore Fabrication and Offshore Installation
- Review of QA /QC Documents
|
1982-1983 |
Amrya Cement Co. |
Steel Structure ,Pipelines, Fuel Tanks, Anchor Bolts |
- Design Calculation Check Through Germanischer Lloyd
- Material Inspection
- Preparation of N.D.T Procedures
- performance of UT,RT,MPT
- Welding Supervision
|
1983-1987 |
Gulf of Suez Petroleum Company (GUPCO) Gas Production |
Fabrication of 5 Bridges and 2 Offshore Platforms Consisted of 2 Jackets, 4 Decks and Piles in Mirkab Yard and Fabrication of 2 Bridges in Timsah Yard ,Ismailia |
- Performance of N.D.T Required Including Rt and UT
|
1985-1986 |
ESSO, East Zeit Bay Terminal |
3 Floating Roof Crude Oil Tanks 100000 Brls Each, Terminal Facilities, Power House |
- Preparation of Radiographic Procedures
|
1985 |
Defense Ministry, Main Zone Workshops |
Main Workshop Steel Structure ,Painting Workshop Steel Structure, Supplementary Workshop Steel Structure |
- Material Inspection
- Drawing Review
- Welding Inspection including welding procedure and welders qualification text supervision
- Welding Supervision
- Dimensional Check
- Performance of Ultrasonic and Radiographic Tests
|
1985 |
PETROJET
(North Branch, East Branch, Kattamia Workshop, Burulus Gas Plant, Burulus Pipe Line) |
Inspection of all Lifting Equipment ,Cranes (Telescopic Cranes, Tower Cranes, Side Booms |
- Certification and Inspection of all Lifting Equipment, Cranes, and Appliances
|
1986-2011 |
SUCO L.P.G.3 spherical storage tanks at Zeit Bay site |
Three high tensile steel spherical tanks |
- Preparation of N.D.T. procedures according to ASME Specification
- Performance of UT, MPT, LPT
- Supervision of Radiographic Testing crews
- Hardness Testing of crack repaired areas
- Crack propagation monitoring by UT
|
1986-1987 |
Gulf of Suez Petroleum Company (GUPCO) 2 Offshore Platform EMS ,SMB and process piping |
Fabrication of two - 4 legs fixed Offshore Platforms Consisted of 2 Jackets ,4 Decks , piles and process piping in Timsah Yard |
- Third Part Inspection on Behalf of Timsah Co. including performance of UT, MPT, RT and Visual Welding Inspection
|
1986-1987 |
Egyptian Petrochemical Ethylene Offshore Terminal –Dekheila, Alex. |
1.8 legs Fixed Offshore Platform |
- Preparation of N.D.T. procedures
- Preparation of UT, RT, MPT, DPT Onshore and Offshore
|
1986-1987 |
WEPCO Development of Umbaraka /Meleiha Crude Oil Field in Western Desert |
Crude oil storage tanks installed at Umbaraka and Meleiha Field located in the Western Desert |
- Inspection of materials and Essential components at site
- Welding Inspectors performing welding procedure, Qualification, welders qualification tests, Destructive and Non Destructive tests
- Painting /coating inspection
- Hauling, Stringing, Ditching, Blasting, lowering in back filling and Road Crossing inspection
|
1986-1987 |
Egyptian Petrochemical Co. Plants |
Double Wall Stainless Steel Ethylene Tanks, P.V.C. Plant, V.C.M. Plant, Power station & facilities |
- Material Inspection
- Construction Supervision & Welding Inspection
- Film Interpretation
- Review of N.D.T Reports
- Radiographic Inspection
|
1986-1988 |
Western Desert Petroleum WEPCO Computerized Inspection Program |
Inspection of Equipment ,Piping ,Pipelines, Tanks and Pressure Vessels |
- All Inspection Services required including performance of thickness Measurements and flow detection by Ultrasonic ,Corrosion rates measurements by Radiography ,Surface and Sub –Surface Inspection using MPT
|
1987-1988 |
General Petroleum Co. (G.P.C) |
Two 4 –legs Identical Fixed Offshore Platforms F-F& G-G Fabrication of 2 jackets ,6 Decks Piles Installation |
- Ultrasonic ,Radiographic, Magnetic, Dye Penetrant, and Hardness Inspection
|
1987-1988 |
Damanhour Power Station Boilers Repair and maintenance project |
Three boilers complete Overhauling including Piping Replacement in the station site |
- Third part inspection on behalf of Damanhour Power Station including performance of required Radiographic Testing
|
1987-1988 |
Gulf of Suez Petroleum Company (GUPCO) M 180 Offshore Platform |
Fabrication of 4- legs fixed Offshore Platforms Consisted of Jackets ,3 Decks |
- Performance of N.D.T. of Ultrasonic Testing and Hardness Testing
|
1988 |
Gulf of Suez Petroleum Company (GUPCO), October G Offshore Platform |
Fabrication of Offshore Platform Consisted of Jackets ,3 Decks and process piping in Ismailia Yard |
- Third part inspection on behalf of Timsah Co. including performance of Radiography, Ultrasonic, Magnetic and Hardness Testing
|
1988-1989 |
Gulf of Suez Petroleum Company (GUPCO), October G Offshore Platform |
Fabrication of Offshore Platform Consisted of Jackets, 3 Decks and process piping in Ismailia Yard |
- Third part inspection on behalf of Timsah Co. including performance of Radiography, Ultrasonic ,Magnetic and Hardness Testing
|
1988-1989 |
Badr El-Din Petroleum Company (BAPATCO) |
Onshore , Natural gas 270 km Length Pipeline between Badr El-Din site ,Western Desert , Alex. |
- Inspection and Supervision of testing, Safety check and Certifying according to Specification
|
1988-1989 |
CAIRO Subway |
8 “ Steel Pipe Covering High Voltage Underground cable |
- Radiographic Inspection
- Film Interpretation
|
1989-1992 |
Kelli Pumping Station |
Kelli Pumping Station is a floating pumping station placed on three pontoons suffered from vibration leading to cracks |
- 600 Man – Hour Inspection Works
|
1989-1990 |
Gulf of Suez Petroleum Company (GUPCO) |
Fabrication of Offshore Platform consisting of 2 Jackets, 3 Decks Bridge and Process Piping |
- Performance of N.D.T. of Ultrasonic
|
1989-1991 |
Petroment Company
- WEPCO ElHamra
- Alamein Field
- Petro Amir Project
|
Process Piping Up -grading |
- Welding Inspection
- Welding Supervision
- Film Interpretation
|
1991-2007
&
2009 - 2011 |
AGIBA Co., West Razzak Oil Field Development |
7 Cylindrical Tanks |
- Calibration of 7 Cylindrical Tanks according with API 2550 by 2 Qualified Inspectors
|
1991-1992 |
WEPCO South Umbaraka |
6 Cylindrical Tanks |
- Calibration of 6 Cylindrical Tanks according with API 2550 by 2 Qualified Inspectors
|
1993 |
Pipe line for General Petroleum Company |
Magnetic Particle Inspection pipes to detect any surface crack |
- Performance of Magnetic Particle Inspection
|
1993-1994 |
WEPCO EL-MAADIA Flare Relocation |
Flare Relocation |
- Material Control
- Supervision During Fabrication
- Welding Supervision
- Welding Inspectors performing welding procedure and welders qualification
- Painting Inspection
|
1993-1994 |
WEPCO EL-MAADIA Abu Qir Gas Field Project |
Gas Field Onshore |
- Performance of Non Destructive Testing
- Radiographic Test & Heat Treatment Inspection
|
1993-2009 |
Alex. Carbon Black |
6 Cylindrical Tanks |
- Calibration of 6 Cylindrical tanks according to API Standard 2550 by 2 qualified inspectors
|
1994
&
2008 - 2010 |
SEA GULL EAST ZEIT PETROLEUM (ESSO) |
Inspection of all field Lifting Equipment ,Cranes, and Appliances |
- Certification and Inspection of all field Lifting Equipment ,Cranes, and Appliances
|
1995-1999 |
Petrojet At all Sites |
Welding Gauges, Heat Treatment sets, Welding Machines,
Holiday Detector, Coating Thick. Instrument, Pocket Dosimeters, Densitometers, Survey meters and Pressure Gauges |
- Equipment Test & Calibration
|
1995 - 2005 |
Alexandria Petroleum Company |
22 Cylindrical Tanks |
- Calibration of 22 Cylindrical tanks according to API Standard 2550 by 2 qualified inspectors
|
1997 |
Egyptian Natural Gas Company (GASCO) |
Pressure Gauges |
- Equipment Test & Calibration
|
2001-2009 |
Transocean Adabbia Port
Project: Cement Line
Yard: Mercury Rig |
Cement & Mud pipes |
- Radiographic Inspection with and Ultrasonic flow Detection on 4.5 O.D. pipe line butt weld (off-shore) Radiographic Inspection, Ultrasonic Testing , Magnetic Particle Testing, Heat Treatment and Hardness Testing
|
2001 -2003 |
Transocean Abu Qir Port |
Stand Pipe Valve Replacement on the Deepwater Expendition |
- Heat Treatment and Hardness Testing,
- Radiography Inspection
- M.P.I & D.P.T
|
2007 - 2088 |
Abu Qir Fertilizer Co. |
Pocket Dosimeters |
- Equipment Test & Calibration
|
2001-2003 |
AIR LIQUIDE
Site : Tanta , Bani Sweif , Assuit, Sohag , El- Menia , Cairo, Alexandria, |
COCACOLA & PEPSI CO2 Storage Pressure Vessel |
- Visual Inspection, Thickness Measurement, Ultrasonic Test and Hydro Test Inspection
|
1997-2009 |
HALLIBURTON
(Jim Cunningham Rig) |
Cement & Mud pipes |
- Radiographic Inspection & Heat Treatment and Hardness Testing
|
2002-2003 |
Ebeed Engineering Co.
Project: Fountain in Libya |
Drilling pipes |
- Inspection of drilling pipes visually, outside dimensions, Thickness Measurement, and Magnetic Particle Examination for end area
|
2002-2003 |
Suez Odense Marine Services (SOMS)
Pero Negro –4
AL-Mahad |
Pero Negro –4 AL-Mahad |
- Ultrasonic Inspections , Magnetic Particle Inspection on Pero Negro 4, Radiograghic Testing on AL- Mahad
|
2002-2003 |
Global Santa Fe
(Cement Line Rig 105) |
Cement & Mud pipes |
- Radiographic Examination & Heat Treatment and Hardness Testing
|
2002-2003 |
ELEJECT
Abu Quir Power Station – El- Tarh |
Inspection of all site welds by Radiographic Testing |
- Radiographic Testing for project (about 3000 film)
|
2002-2003 |
PETROJET
(Merghum, Idku, Damietta) |
Cement Station and Aggregate Mixer |
|
2002-2006 |
Jotun Paints |
Coating Thickness Gauges |
- Equipment Test & Calibration
|
2003 |
Amriya Pharm IND. |
Temperature Thermometer Sets |
- Equipment Test & Calibration
|
2003 |
Hassan Allam Sons |
Holiday Detector |
- Equipment Test & Calibration
|
2003-2005 |
ORASCOM |
Pressure Gauges |
- Equipment Test & Calibration
|
2003-2005 |
Hempel Egypt |
Coating Thickness Instruments |
- Equipment Test & Calibration
|
2003 |
Engineering Group (E.G.C) |
Coating Thickness Gauges |
- Equipment Test & Calibration
|
2003 |
Timsah Ship Building Co. (Tim Barge)
Site : GUPCO Site (AKHEN) |
Inspection of all site welds by all types of non destructive testing |
- Third party in inspection of all welds by using Ultrasonic Test, Radiographic Test, Magnetic Particle Test , Dye Penetrant Test
|
2003-2004 |
Canal for Marine Constructions
Site : Port Said |
Split Barge |
- Ultrasonic, Radiographic, Magnetic Particle and Dye Penetrant Inspection
|
2003-2004 |
Port Said for Engineering Works
(PSEW)
Site: Badr El-Din |
Badr El- Din Tanks |
- Third party in inspection of Badr El-Din tanks by using UT, MPI, RT, DPT
|
2003-2004 |
National Navigation Co. |
Pressure gauges |
- Equipment Test & Calibration
|
2003 - 2005 |
Misr Petroleum Co.
Site : Misr Petroleum Company |
TANKS NO.2,13 &101 |
- Magnetic Particle, Dye Penetrant &Radiography Inspection
|
2004 |
SIEMENS |
Test Bench |
|
2004 |
Egyptian Maintenance Company (E.M.C)
Site : Tanta-Nubaria 24"Line
|
Tanta – Nubaria 24" Line – Khalda Elsalam |
- Radiography Inspection & Heat Treatment
|
2004 –2007
&
2009 |
Egyptian Maintenance Company (E.M.C) |
Elrazzak & GUPCO Abuelghradia |
|
2008 |
Assuit Power Station |
Boiler unit No. 1 |
|
2005-2008 |
Maradive |
MOS 87
Maradive 300 |
- M.P.I , D.P.T , Ultrasonic Test, Thickness Measurements
|
2003-2009 |
ISO TERMICA |
Coating Thickness Gauges |
- Equipment Test & Calibration
|
2005 |
Egyptian Drilling Company (E.D.C)
All Rigs |
High pressure pipeline at Rigs No. 52 , 42, 41, 53, 17, 47, 3, 62, 63, 10 & kamose |
- Ultrasonic and Radiography Inspection
|
2005 - 2011 |
KAHROMIKA
Kafr El Dawar Power Station, KED Power Station, Nubaria Power Station |
106 & 118 contract at Nubaria, Unit 1 at kafr eldawar power station &18M watt at KED power station |
- Ultrasonic and Radiography Inspection
|
2005 - 2009 |
Egyptian Liquefaction Natural Gas (ELNG) |
Liquefaction of Natural Gas Project |
- Radiography Inspection & Heat Treatment Test
|
2005-2007 |
Thyssenkrupp Xervon Energy |
APC- Project in Alexandria – Enquiry for Gamma ray welding Test . |
|
2007-2008 |
Advanced Energy System (ADES) |
Admarine II at suez ship yard, Inspection of Pad eyes at Hurgada & at Abu Rudies |
- Radiography Inspection & M.P.I. ,Thickness Measurements, D.P.
|
2006-2009 |
Nubaria For Manufacture & Refining Co. |
Boiler No. 1,2 & Super Heater |
|
2007 |
Alexandria Carbon Black Co. |
Boiler No. 2 , 4 |
- Radiography Inspection about 1000 films
|
2007-2008 |
Shotmed For Engineering Co. |
Boiler of Alex. Carbon Black |
|
2009-2010 |
ESACO |
Middle Part , Upper Part , Lower Part , Stack , Wall panel |
- Radiography Inspection about 1000 films
|
2007-2009 |
Arab Contractors |
W.Q.T |
|
2007 -2009 |
ADES |
Admarine II |
- M.P.I Thickness Measurements, D.P.T , Ultrasonic Test
|
2007-2009 |
Port Said for Engineering works Co. |
Sidi krir Power Station & W.Q.T
Abu Qir power station |
|
2008-2011 |
Faster Group |
Pipe Support |
- Radiography Inspection , Visual Inspection , D.P.T
|
2009 |
Egyptian Maintenance Company (E.M.C) |
Amriya petroleum and Abu qir petroleum |
- Radiography Test
- W.Q.T
- Tank calibration
- Load Indicator calibration
|
2009 - 2011 |
SAG |
Sigma H 320 |
|
2009 - 2010 |